27/02/13: Filming (3:30-6:00)
Filming all the shots including the dining room, bedroom and front door scenes at friend's house on Burntwood Lane.
28/02/13: Editing (3:10-5:00)
Importing all the footage into iMovie and begin editing it.
Take a rough copy home on a usb to make the music to it
No comments:
Post a Comment